Designs for stage one of the Koondrook levee works have been finalised. The project, when completed, will mitigate the risk of riverine flooding in the Koondrook township. The design height of a 1% flood, or 1 in 100 event may also reduce the need for increased floor heights on new housing developments within the township.
While the township has no history of flooding, the 2022 flood event highlig
Subscribe to The Bridge to read the full story.